Weighted performance rules
SLA, availability, QHSE, documents, NCRs, caps, and other groups contribute through configured contract logic.
Contract scope, SLA, weighted KPI groups, caps, capture periods, deductions, overrides, and draft invoices preserve the commercial outcome of operations.
Built from the approved module specification as a representative system view. Final production screens may differ.
SLA, availability, QHSE, documents, NCRs, caps, and other groups contribute through configured contract logic.
Approved measurement periods and audit-controlled overrides preserve what was scored for the invoice cycle.
The deduction and net payable retain their connection to KPI results and the records behind them.
Define contract scope, calendars, SLA, KPI, caps, and rules.
Read approved operating results from connected modules.
Lock the agreed performance period and approved exceptions.
Calculate deductions and prepare the traceable payment result.