All modules
Module 13

Water and Energy

Verified utility evidence

Evidence before analytics.

Meter rounds, tank levels, main-to-sub-meter reconciliation, calibration, carbon factors, water testing, and a printable quality logbook share one controlled evidence chain.

2 blocksconsumption control and water quality
CAFMPROWater & Energy EvidenceRepresentative view
QR-verified readings96.4%
Open conflicts2
Water tests passed97%
Main / sub-meter reconciliation1.8% variance
Main meter184.0 MWh
Chillers91.4
AHUs54.7
Other34.6
Water quality logbookNetwork WN-04
QR sampling point Verified
Residual chlorine0.52 mg/L
Turbidity0.18 NTU
Control limit versionCL-V4
Representative CAFMPRO interface

Built from the approved module specification as a representative system view. Final production screens may differ.

Operational value

CAFMPRO is designed for the real estate you have now: a reading cannot be submitted without the correct QR scan and photo, unless an owner approves a reasoned bypass with evidence.

01

Main and sub-meters must reconcile

Variance beyond tolerance creates a controlled consumption conflict that the collector cannot close alone and that can trigger calibration or maintenance.

02

Water quality has a formal record

Sampling points use QR confirmation, control limits are versioned, out-of-range results require action, and the complete history prints as a Water Quality Logbook.

03

Carbon stays explainable

Every calculation stores its activity quantity, conversion, approved factor, factor version, scope, and boundary. Missing evidence marks readiness rather than inventing certainty.

Operational story

How the module works in practice.

01

Verify

Scan the exact meter or sampling-point QR.

02

Capture

Record reading, photo, sample, or approved bypass.

03

Reconcile

Compare hierarchy, tank movement, refill, and tolerance.

04

Act

Raise conflict, calibration, retest, or maintenance evidence.

Connected by design

The record keeps moving.

Assets Properties Maintenance QHSE Contracts and KPI
Next module

Library and Document Control

Document deadlines that count.

Explore next module

See Water and Energy configured around your operation.